close

WeChat public platform

Mobile app client
Products
Contact Us
Dongguan Wise Lighting Technology Co., Ltd.
Contact telephone:
+86-0769-81020058
Tel:+86-13378611119
Fax:+86-0769-22318251
Contacts:Mr. Gu
Address:5th Floor, Tongsheng Technology Park, Zongtui Road, Dalingshan Town, Dongguan City, Guangdong
Mail box:wiseled@aliyun.com
Location:  Home -> Products  ->  Sports Lighting  ->  TLG Series stadium lights  ->  TD600W
  • Detail

  • technical parameter

  • Installation instructions

  ·Use high-quality copper material for heat treatment and has a good heat dissipation effect.
  ·With high efficiency LED Lighting scource,Low light decay,long lifespan.
  ·PC Lenses,make the light soft,Anti-glare design, Uniform distribution of light.
  ·High Color rendering index Ra>80,Color Temperature 5500K,Meet the requirements of professional match lighting .
  ·Waterproof IP67,Anti-wind level 17,could be work in the bad weather .
  ·Independent power box design is beneficial to the lamp house heat dissipation , reducing the light attenuation and extending the lifespan of the light source.
  ·bracket is equipped with 180 adjustable Angle, which is more convenient to be installed in different area.
  ·Applications: basketball court, football field, tennis court, golf course, swimming pool, volleyball etc.
600w  stadium lights Item NO: TLG-600A
Application Basketball court, soccer field , tennis course , golf course, volleyball court etc.
Mounted Type pole mounted
Parameter  Voltage  AC100-240V
Power  600W
Power Factor ≦0.9
CCT 2700-6500K
luminous Flux 72000±5%
Beam Angle 10°/15°/60°
IP  Level IP65
Insulation class I
Operating Temperature  -30~50°
Lifespan 50000H
IMPORTANT SAFEGUARDS
When using electrical equipment, basic safety precau ons should always be followed including the following:
READ AND FOLLOW ALL SAFETY INSTRUCTIONS
1. This product is used in areas with no electrical supply and/or
areas with good climatology. Can be used in a wide range of
places, such as roads, walking paths, parking lots, gardens,
residen al districts, etc.
2. When installing, be sure that the light can perfectly reach to the
panel light and is not blocked by any element such as buildings or
trees.
3. To avoid the possibility of electrical shock, turn o power supply
before install or during maintenance. It must be performed by
qualified personnel.
4. Product must be installed in accordance with your local electrical
code. If you are not familiar with these codes and requirements,
consult a qualified electrician.
5. Do not change the structure or any commponents of the fixture
to ensure safety.
product

Model No.

Power

Dimensions

Weight

WS-LED-10

10W

502*295*65MM

5.3kg

WS-LED-15

15W

704*295*145mm

7.5kg

WS-LED-20-25

20W/25w

886*295*145mm

10.2kg

WS-LED-30-40

30W/40w

1114*295*145mm

15kg

SF-LED-50

50W

1114*420*145mm

18kg

SF-LED-60

60W

1114*420*145mm

19kg

SAVE THIS INSTRUCTIONS FOR FUTURE
REFERENCE INSTALLATION:
STANDARD MOUNTING
(Can be used in 10W/15W/20W)
STEP 1:
socket As shown in Diagram2, connect
the screw (M8*50MM) with nut (M8)
throughthe staple bolt, do not ghten.
STEP 2:
pole As shown in Diagram3, set the lamp
into the nut*¹ screw*² *¹ Nut: M8*² Screw:
M8x50mm body 2 light pole.
STEP 3:
As shown in Diagram4, adjust the body
to the appropriate loca on using No.14
wrench and 6mm Allen wrench with the
torque of body 15NM, then ghten the
crews.
STEP 4:
As shown in Diagram 5, installa on is
completed.
This marking indicates that this product should not be disposed with other household wastes throughout the EU. To prevent possible harm to the environment or human health from uncontrolled waste disposal, recycle it responsibly to promote the sustainable reuse of material resources. To return your used device, please use the return and collec on systems or contact the retailer where the product was purchased. They can take this product for environmental safe recycling.
STEP 1:
As shown in Diagram6, a er the lamp is
installed on the pole (installa on way
referred to the procedure used in 10w/
15w/20w), connect the screw (M8*50MM)
with nut (M8) through brace strut and
fastenings, do not ghten; connect the
screw (M8*50MM) with nut (M8) through
suppor ng hoop component and brace
strut, do not ghten.
STEP 2:
As shown in Diagram7, connect the screw
(M8*50MM) with nut(M8) through brace
strut and suppor ng hoop component, do
not ghten
STEP 3:
As shown in Diagram8, ghten the screws using No.14 wrench and 6mm Allen
wrench with the torque of 15NM.
STEP 4:
As shown in Diagram9, installa on is
completed.
Dongguan Wise Lighting Technology Co., Ltd. © Copyright 2016
Technical Support:【Dongguan Website】 Views: BMAP】【GMAP粤ICP备16028726号-1